PROPOSTA DE CONTROLE DE ESCOPO POR MEIO DA ESTRUTURA ANALÍTICA DO PROJETO (EAP): ESTUDO DE CASO

Authors

  • Priscila dos Santos Gama Fatec Guarulhos
  • Celso Jacubavicius Fatec Guarulhos
  • Alexandre Formigoni Fatec Guarulhos

Keywords:

Estrutura Analítica do Projeto, Controle de Escopo, Qualidade, Work Breakdown, Control Scope, Quality

Abstract

This paper elucidates the application of the Work Breakdown Structure (WBS) and addresses the control analysis scope in a company's educational arm. The main objective is to demonstrate ways to use the WBS and indicate a parallel way to enable its deployment in control of projects of a company teaching, demonstrating the company's current practice and possible enhancement proposal. For this bibliographic research on the topic and qualitative case study of a company active in the market were made. The results of the research show that the control scope already used in the institution attend to expectative, but can be improved from a more analytical and illustrative use of EAP for a better control and design quality. In terms of gain, it is noticed how easy is to interpret the project and how the level of failures decreases, it is hard to measure financial gains because each project is unique.

Downloads

Download data is not yet available.

References

ANBARI, F. T. Earned Value Project Management Method and Extensions. Project Management Journal, p. 12-23, 2003.

BELOUT, A.; GAUVREAU, C. Factors influencing project success: the impact of human resource management. International Journal of Project Management p. 22, 2004.

CHARVAT, Jason. Project Management Methodologies. John Wiley & Sons, NJ, 2003.

PINTO JK, SLEVIN DP. Project success: definitions and measurement techniques. Project Management Journal; p. 67–73, 1988.

PMI. Practice Standard for Work Breakdown Structures. Project Management Institute, Second Edition, 2006.

PMI. Um guia do conhecimento em gerenciamento de projetos (Guia PMBOK®). Project Management Institute, Quinta Edição, 2013.

Referências Eletrônicas

DUARTE, Claudia. Estrutura Analítica do Projeto (EAP) – Work Breakdown Structure (WBS). Avellar e Duarte Consultoria e Design, 2010. Disponível em:
<http://www.avellareduarte.com.br/projeto/planejamento/planejamento5/planejamento5.htm> Acesso em: 20 de setembro de 2014.

STONNER, Rodolfo. Estrutura analítica do Projeto (EAP). 2013. Disponível em: <http://pmoacademy.com.br/estrutura-analitica-de-projeto-eap/>. Acesso em: 23 de novembro de 2014.

Published

2017-03-07

How to Cite

Gama, P. dos S., Jacubavicius, C., & Formigoni, A. (2017). PROPOSTA DE CONTROLE DE ESCOPO POR MEIO DA ESTRUTURA ANALÍTICA DO PROJETO (EAP): ESTUDO DE CASO. South American Development Society Journal, 1(1), 109–123. Retrieved from http://www.sadsj.org/index.php/revista/article/view/8

Most read articles by the same author(s)

> >> 

Similar Articles

> >> 

You may also start an advanced similarity search for this article.